Material per order

Record requirements, track withdrawals, see open quantities — the order's Material tab and its two withdrawal locks.

What an order needs in materials, and what of it is already out, is shown on the order's "Material" tab (sidebar → Orders → open the order). Three columns tell the story: Requirement, Withdrawn, Open.

Recording a requirement

A material line item consists of an item and a quantity. Admin and Planner may create and change them; anyone adding the same item twice is stopped: "This item is already in the order." Increase the quantity of the existing line item instead.

Why a withdrawal can be blocked

Two checks must be green:

  1. The order must be released or in progress: "Withdrawal is only possible for released or running orders."
  2. The line item must be available, meaning status "From inventory" or "Delivered". For "To order" or "Ordered" it says: "Withdrawal not possible: material has not been delivered yet."

How the withdrawal itself works is described under Withdrawing material.

By the way, material line items never count as work steps. They appear neither in planning nor under "My work" as a task.

Auch bekannt als: material requirement, assign material, withdrawal locked, requirement, bill of materials.

Zuletzt aktualisiert am

Passt dazu

Frage offen geblieben?

Schreiben Sie uns — wir antworten und ergänzen den Artikel.

Frage stellen