Job time: a timer on every task, booked against planned

The time clock says how long someone was there — the timer on the task says what they worked on. On the task card you see during the work where an order needs more hours than planned.

No credit card · trial ends automatically · servers in Frankfurt

Gantway task cards with a running timer and time budget logged against planned

How you work with it

The time clock tells you how long someone was at work. Job time tells you what they worked on — which is why Gantway keeps them as two separate records — that still share one working day: starting a break pauses the timer with it, and clocking out ends it. So your customer never pays for lunch. Time is logged right on the task: live with a timer or afterwards via “Log time”. The task card immediately shows how much of the estimated duration has been used, and turns red as soon as it is more. Wrong entries are not deleted but reversed with a reason; the history stays complete. On the Premium plan, logged hours flow into post-costing, where they become plan versus actual per order and line item.

A timer on the task

The timer icon sits on every task, in “My Work” and on the Desk. A running timer stays visible in the sidebar wherever you are. Each person runs exactly one; starting the next one asks for confirmation and switches without double-counting. Accidental starts under 30 seconds are discarded.

  • Timer icon on every task, also on “My Work” and the planning board
  • Exactly one timer per person — switching without double time
  • Starts under 30 seconds are discarded

A timer on the task

Plan versus actual in post-costing

On the Premium plan, every logged hour flows into post-costing automatically. There it sits against the calculated time, per order and line item, color-coded — green on plan, amber up to ten percent over, red beyond. No retyping, no Excel reconciliation.

  • Every booked hour flows into post-costing — on the Premium plan
  • Plan versus actual per order and line item, color-coded
  • No retyping, no Excel reconciliation

Plan versus actual in post-costing

Also included

Logging in quarter hours

Not every hour is timed live. With “Log time” you enter date and duration afterwards — up to 10 hours in 15-minute steps. Backdated entries carry the label “Logged retroactively”; Gantway rejects entries in the future, and more than 24 hours per person and day as well.

  • Add date and duration, up to 10 hours in 15-minute steps
  • Backdated entries carry the “Added later” marker
  • Future dates and more than 24 hours per day are rejected

Booked against planned on the task card

If a task has an estimated duration, its card shows logged against planned as a bar — blue within budget, amber from 80 percent, red beyond with the note “over plan”. The deviation shows up during the work, not at invoicing. Included in every plan.

  • Booked against planned as a bar on the card
  • Blue within budget, amber from 80 percent, red over plan
  • Included in every plan

Reverse instead of delete

A wrong entry is reversed with a mandatory reason. Gantway creates an offsetting entry, and both remain in the history. Anyone who logs time can reverse their own entries; admins, planners and team leads can reverse other people’s.

  • Reverse with a mandatory reason instead of deleting
  • Counter-booking, both stay in the history
  • Admins, planners and team leads reverse other people’s entries

A safeguard against forgotten timers

If a timer keeps running overnight, Gantway stops it automatically after the configured threshold (default 12 hours, adjustable from 1 to 24). The time is capped at the threshold and flagged “Stopped automatically — please check”, instead of silently putting 60 hours on the order.

  • Automatic stop after a configurable threshold (default 12 hours)
  • Time is capped and marked “please check”

Three typical situations

  • From task to task: Cutting is done, edge banding is next. Start the timer on the next task, confirm the switch — the first timer is logged, the second is running.
  • Catching up at the end of the day: “Yesterday afternoon it was three hours on assembly.” Log time, date yesterday, 3 hours. The entry is labeled as logged retroactively — visible to everyone, without suspicion.
  • Better estimates: Three orders in a row, edge banding shows red on the card. For the next quote you plan half an hour more for it — based on logged numbers rather than gut feeling.

Book the next hour to the right order